The following are a few photographs that show the contractors installing the ducting that will carry the cable that will connect Settle Hydro to the National Grid. A cable will be laid from the Powerhouse to a connection box at Bridge End Mill. This box can be seen in the photographs. A duct has been laid under the Langcliffe Road and the trench is being excavated to take the cable to the Grid connection point in Duke Street.